Design Guidelines

These building guidelines form part of our commitment to creating a community that is a great place to live, both now and well into the future.

These guidelines apply to all dwellings to be built and will form part of the contract you enter into when you purchase land at 1881 Tullimbar.

These regulations are strictly aesthetic in their intent. In no way does compliance with these regulations exempt a structure from compliance with local authority requirements.

These building guidelines spell out how houses can be part of an attractive street and a great neighbourhood. There are several elements to the guidelines, which together define the character or ‘essence’ of 1881 Tullimbar.

Approval Process

Check your step by step guide

SETP 1

House Design

Ensure your house design meets the Development Control Plan, Complying Development Code (if applicable) and 1881 Tullimbar Design Guidelines

SETP 2

Pre-lodgement

Apply Pre-lodgement Approval by submitting your “Pre-lodgement Application Form” to the Dahua Design Administrator at designadministrator@1881tullimbar.com.au. The Dahua Design Administrator will reply within 21 days of receiving your “Pre-Lodgement Application Form”.

SETP 3

House Completion

Home completed in accordance with approvals and Occupation Certificate issued.

SETP 4

Landscape

Complete your front landscaping.

SETP 5

Compliance Bond

To claim your $2,000 Compliance Bond – complete the Compliance Bond Release Form (Refer to section 3.3). Submit to Design Administrator at designadministrator@1881tullimbar.com.au upon completion of your home and landscaping

Download Building Design Guideline

Each stage has it’s own specified design requirements

Stage X1 Kiteflyer

Lot 1- Lot 38
Settlement: Aug 2021

Stage 1 -4

Stage 1: Lot 1-131 Settlement April 2022
Stage 2: Lot 201-278 Settlement Feb 2021
Stage 3: Lot 301-326 Settlement Sep 2021
Stage 4: Lot 401-450 Settlement Dec 2021

Stage X1 Residue

Lot 39, 40
Settlement: Aug 2024

Stage 4 Residue

Lot 451- Lot 465
Settlement: Nov 2024

Stage 7,8 & 9

Coming Soon

Stage 5

Coming Soon

Reset password

Enter your email address and we will send you a link to change your password.

Powered by Estatik
Scroll to Top